Knight
Well-known Member
Doesn't look complicated but reducing from 1" supply to 3/4" previous supply took work. Then in order to comply with county code new valves had to be added. Toss in adapting from schedule 40 PVC to copper. PVC takes gluing copper takes sweating. All have to be precision cut in order to align.
Separating hose supply & piping to back yard another extra I put in along with an inline filter as a just in case precaution.



Separating hose supply & piping to back yard another extra I put in along with an inline filter as a just in case precaution.


